Executed technical design and due diligence for a 350kW solar-battery hybrid mini-grid serving mixed residential and commercial loads across 380 connection points. The project required advanced modeling in PSS®SINCAL to optimize battery integration, manage peak demand, and ensure power quality. Comprehensive protection studies included fault level calculations, circuit breaker sizing, and relay coordination across the entire network.
Distinguished by innovative application of qGIS automation for rapid BoQ updates and scenario analysis. The final design reduced material costs by 12% compared to conventional approaches while improving system reliability. Detailed as-built documentation and operations training materials ensured sustainable long-term performance and community ownership of the infrastructure.